The "What Are You Working On?" Thread

2DI4Z1E.jpg

59" of floor space behind the 2nd row of seats, 48 cubic feet. That's a lot of beers. ... if you fold down the second row of seats you can fit 4x8' sheets of plywood in this with the hatch closed.
 
Last edited:
Finished all of the buildings and major structures for Miramas for the 1925, 1926, and 1932 layouts (as well as a couple of vehicles I got sidetracked with modeling). The pitboxes and grandstands were still under construction for the 1924 race, so I'm currently in the process of modeling the partially-built grandstands for the 1924 layout.
Screenshot_ks_mazda_miata_miramas_10-5-122-13-10-44.jpg
Screenshot_ks_mazda_miata_miramas_10-5-122-13-10-0.jpg
Screenshot_ks_mazda_miata_miramas_10-5-122-13-11-32.jpg
Screenshot_ks_mazda_miata_miramas_10-5-122-13-11-11.jpg


Onboard lap video of the 1926 layout:
 
Finished all of the buildings and major structures for Miramas for the 1925, 1926, and 1932 layouts (as well as a couple of vehicles I got sidetracked with modeling). The pitboxes and grandstands were still under construction for the 1924 race, so I'm currently in the process of modeling the partially-built grandstands for the 1924 layout.View attachment 573451View attachment 573452View attachment 573453View attachment 573455

Onboard lap video of the 1926 layout:
Oh my goodness! You are doing such a great work! My compliments!
 

Latest News

How often do you meet up (IRL) with your simracing friends?

  • Weekly

    Votes: 60 9.3%
  • Monthly

    Votes: 33 5.1%
  • Yearly

    Votes: 40 6.2%
  • Weekly at lan events

    Votes: 3 0.5%
  • Monthly at lan events

    Votes: 2 0.3%
  • Yearly at lan events

    Votes: 14 2.2%
  • Never have

    Votes: 503 78.2%
Back
Top